N-31 Road Project

Navajo Engineering Construction Authority

Navajo, New Mexico

Before picture of the rock to be blasted and presplit.

N-31 Project: N.E.C.A. needed this corner to be blasted back and presplit to make room for the new road.

M.C. Donegan: Provided controlled drilling, blasting, and presplitting.